Nigeria Modernization Railway
  Time:2012-09-20  Clicks:   
【Font:Big middle small

Engineering Survey

The Nigerian Modernization Railway Project is to build a new double-track standard-gauged railway from the southern city Lagos to the northern city Kano. The railway, with a full length of 1,315km and a design speed of 150km/h, is designed in accordance with Chinese railway specifications.

The railway section designed by SIYUAN is located at the southmost end of the project, with a main line of 250km and two branch lines of 8.5km and 7km respectively. In terms of the general engineering conditions, it’s a section with the highest technical content along the whole line, due to the dense vegetations and soft formation development.

On April 22, 2007, SIYUAN completed all the reconnaissance works, and then carried out the large- scale survey works for the project.

On July 13, 2008, SIYUAN advance team of 20 people arrived Nigeria for the supplementary survey works of the Nigerian Modernization Railway.

On January 18, 2011, construction commenced for the section Abuja~ Kaduna of the Railway Modernization Project in Nigeria.


Engineering Survey



Engineering Survey

Produced By 大漢網(wǎng)絡 大漢版通發(fā)布系統(tǒng) 欧美激情视频在线观看,久久久99精品免费视频,久久国产深夜福利,精品午夜福利1000在线观看
亚洲第一视频在线播放 | 亚洲成AⅤ人影院在线观看 日本日本乱码伦视频在线观看 | 亚洲va成高清在线播放人 | 图片色色中文字幕 | 中文字幕欧美久久久 | 在线视频国产网址你懂的 |